Agribusiness — Mali
Regular supply for a factory in Bamako
- The challenge
- A manufacturer needed 40 containers a month from the Port of Abidjan and suffered frequent stock-outs caused by border delays.
- Our solution
- Weekly pick-up planning, systematic document checks before departure and a shared daily status update.
Results
- Average lead time cut to 5 days
- Zero production stoppages over 12 months
- Lower safety stock